Set in the heart of downtown Toronto, the Ontario Court of Justice is the largest courthouse in Ontario and a benchmark for contemporary institutional construction. Completed in 2024, the project brings together 63 courtrooms and 10 conference settlement rooms in a LEED® Gold certified facility that reflects modern civic values—transparency, accessibility, and sustainability.
Master Builders Solutions Canada Inc. played a key role in ensuring the structural concrete met the performance demands of this high-profile project.
The Challenge
Delivering nearly 48,000 m³ of ready-mixed concrete in a downtown location posed numerous technical challenges. The structural design demanded high compressive strength, consistent workability, and durability to support complex load paths, security zones, and a tall atrium enclosed by a 20-metre glass façade.
The project team required concrete solutions that would:
These demands were intensified by the need to meet LEED® Gold sustainability targets, tight construction timelines, and high public visibility.
The Results
Master Builders Solutions Canada Inc. partnered closely with St Marys CBM to optimize concrete performance across all phases of construction. A suite of high-performance admixtures—including water reducers, retarders, and strength-enhancing additives—was deployed to address the project’s structural and logistical complexities.
Key contributions included:
By tailoring admixture solutions to the precise performance needs of each mix design, Master Builders Solutions supported consistent quality and efficiency throughout the build.
The Ontario Court of Justice now stands not only as a civic institution but also as a demonstration of what is possible when modern structural design and advanced concrete technology are brought together. The project exemplifies how Master Builders Solutions helps construction teams deliver on performance, sustainability, and long-term value.