OVERVIEW
Renovation stripping out the building completely and rebuilding the walls, Passive Purple® was applied in between the connections of the internal side of the external walls which were a combination of masonry, timber, and steel frame. The ground floor ceiling was removed exposing the warped old timber joists with cracks in the surrounding brickwork and mortar. This was given attention to detail using Passive Purple® Brush to seal above an airtight foam to guarantee the airtightness of this major air leak zone before the final spray coat of Passive Purple® airtight membrane was applied. Passive Purple® was also used to seal window and door linings, ready for the new triple glazed windows to go in. Passive Purple® was sprayed on all the walls and ceiling. This is an ongoing project that still is awaiting an air test, the client is looking to hit 2.5 ach and installing MVHR.
Contact Intelligent Membranes Canada by clicking the button below to find out which products were used in this case study.
Rockwool and Passive Purple
Passivhaus CPD Training Facility
GT Yarmouth - Beattie passive - Retrofit
Citu, Leeds, passive Purple