OVERVIEW
The revamp of this regional flagship shopping centre was a time-critical project. During construction, the existing retail businesses and visitor access needed to be kept to a minimum. Steintec's tuffset G was used in the preparation of the bedding, priming and jointing mortars to achieve earliest trafficking wherever possible. The proven capability of tuffset G to achieve this in ONLY 3 HOURS was used to great effect minimising disruption and inconvenience for the duration of the project.
tuffset G Specialist Rapid Mortar - Specialist bedding, bonding and jointing
Leicester Square.
Luton Town Centre.
One Tower Bridge
Hull City of Culture 2017
Tamesis 1. Granite entrance area with HGV trafficking.
Mortar Buoy increases speed and saves money