OVERVIEW
The Grange University Hospital was opened ahead of schedule in November 2020 to meet the winter season pressures exacerbated by Covid-19 second wave. The largest area of hard landscape is outside the main front entrance and includes a pedestrian concourse, bicycle storage, bus stop and a one-way vehicle looped driveway, all constructed as a bound modular pavement.
tufftop 40MPa, High Performance, Optimal Viscosity, Jointing Mortar - BS7533-101 Type 40 jointing mortar
Leicester Square.
Luton Town Centre.
One Tower Bridge
Hull City of Culture 2017
Wandsworth - Osiers Road, Residential Bound Permeable natural stone pavement
Hackney - Daubeney Road, Residential Bound Permeable Pavement
UltraScape flowpoint used at beautiful and historic Citadelle of Namur
UltraScape paves the 'Greenest City' in Europe