OVERVIEW
The new store was built as a main contractor’s design and build shell construction, with a traditional Morrison fit out, and involved working with two design teams simultaneously.
The store was one of the first new stores to incorporate Morrison’s new “hybrid heat reclaim system”, and also incorporated a series of photovoltaic panels and wind turbines on roof areas to contribute to the renewable energy targets required by the local Planning Authority for this new development.
DrillFast low profile A4/316 stainless steel fasteners were utilised as part of the design, with lacquered heads blending in with the panel for a barely noticeable finish.
"Thank you all at Fixfast - you make my job easier"
Paul Guyton - Senior Designer
DrillFast® Stainless Steel DF12-SSA4-P(L)-HT Composite Panel Fasteners
DrillFast® Stainless Steel DF3-SSA4-P(L)-HT Low Profile Composite Panel Fasteners
Multirange Aluminium Rivets
Ocado Distribution Centre
Morrisons - Sheppey
Exeter College Cohen Quad
Curious Brewery
Ocado Distribution Centre
Morrisons - Sheppey
Curious Brewery
Wembley London Designer Outlet
Riverside Resource Recovery Facility
Leeds Arena
SOYO Blocks B + C
Huddersfield Project