OVERVIEW
Delta’s Technical Team along with Delta Registered Installers Marsden Damp Services were approached by the main contractor Wilmott Dixon to give assistance on designing a robust waterproofing solution. Working in collaboration with the architects and project team, this team of waterproofing experts were easily able to offer a simplistic and practical approach.
The project was split into 2 phases with Phase 1 waterproofing the existing stage and orchestra pit and Phase 2, the seating and ancillary rooms which all required the installation of a Type C waterproofing system to ensure a Grade 3 habitable environment was created.
Delta Dual V6 Package Pump Station
Koster Repair Mortar Plus
Delta 800 Series Bespoke Packaged Pump Station (Groundwater)
Delta 800 Series Bespoke Packaged Pump Station (Foul Water) - Packaged Pump Station
Delta Dual V4 Packaged Pump Station
Delta Bespoke 1000 Series - Mercury Foul Packaged Pump Station
Basement Waterproofing
Flood Recovery – Grade II Listed Building
BRE Flood Reilient Test Home
The Gunnery, Kent
Koster Flooring Systems, 96 Middlesex St. London
Koster Floor coatings to a domestic garage.
Aintree Racecourse - Koster Flooring Systems to Grandstand
Koster Flooring Systems - Protection to Concrete bund
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
Remedial Basement Waterproofing