OVERVIEW
Delta’s Technical Team along with Delta Registered Installers Marsden Damp Services were approached by the main contractor Wilmott Dixon to give assistance on designing a robust waterproofing solution. Working in collaboration with the architects and project team, this team of waterproofing experts were easily able to offer a simplistic and practical approach.
The project was split into 2 phases with Phase 1 waterproofing the existing stage and orchestra pit and Phase 2, the seating and ancillary rooms which all required the installation of a Type C waterproofing system to ensure a Grade 3 habitable environment was created.
Delta Dual V4 Packaged Pump Station
Koster Repair Mortar Plus
Delta 800 Series Bespoke Packaged Pump Station (Foul Water) - Packaged Pump Station
Delta 800 Series Bespoke Packaged Pump Station (Groundwater)
Delta Dual V6 Package Pump Station
Delta Bespoke 1000 Series - Mercury Foul Packaged Pump Station
Basement Waterproofing
Flood Recovery – Grade II Listed Building
BRE Flood Reilient Test Home
The Gunnery, Kent
Koster Flooring Systems, 96 Middlesex St. London
Koster Floor coatings to a domestic garage.
Aintree Racecourse - Koster Flooring Systems to Grandstand
Koster Flooring Systems - Protection to Concrete bund
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
Remedial Basement Waterproofing