NBS Source
I'm a manufacturer

Barton Hill Academy

OVERVIEW

Barton Hill Primary School was converted into an academy. As part of these works the structure of the school required renovating and expanded to meet the standards expected. Areas using Polyroof’s systems included new extension roofs, refurbishment of existing roofs, and the creation of colourful dormer pods.


The requirements of this project were as varied as they were demanding. With it being a school the works had to be carried out as rapidly as possible and with as minimum disruption. For safety reasons cold-applied systems were preferred to traditional hot-applied solutions.

polyroof.co.uk

Products featured in this case study

View all products (6)
Protec Overlay Roof Systems - Cold-Applied Liquid Waterproofing

Protec Overlay Roof Systems - Cold-Applied Liquid Waterproofing

Protec Warm Roof Systems - Cold-Applied Liquid Membrane

Protec Warm Roof Systems - Cold-Applied Liquid Membrane

More inspiration from Polyroof Products Ltd

View inspiration
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

More inspiration from Liquid-applied cold roof covering systems

View inspiration
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

More inspiration from Liquid-applied warm roof covering systems

View inspiration
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

Aston Martin Headquarters

Aston Martin Headquarters