NBS Source
I'm a manufacturer

Shard Place Riser Install, London

OVERVIEW

Dura Grating Riser Installation | Case Study


Shard Place is the third phase of the £3.5 billion redevelopment of the estate next to London Bridge station, known as Shard Quarter. 


Reinforced concrete frame and groundwork specialists Getjar were appointed as the formwork contractor by the principal contractor Mace and chose the Dura Composites Riser Install team to take on some of the complex install challenges of the service risers.


Dura’s unrivalled expertise and full install capabilities meant they could deliver a bespoke solution for a large triangular shaped riser on all 26 storeys that required the use of galvanized steel supports and bracketing in conjunction with GRP Dura Grating to allow for cutouts to be performed whilst maintaining the integrity of the riser.

Products featured in this case study

View all products (31)
d² Dura Grating Standard Mesh - GRP heavy-duty floor grating

d² Dura Grating Standard Mesh - GRP heavy-duty floor grating

Post-Fix Dura Riser System - Steel-supported GRP riser flooring

Post-Fix Dura Riser System - Steel-supported GRP riser flooring

More inspiration from Dura Composites Ltd

View inspiration
West Ham Stadium, London

West Ham Stadium, London

The Lock, Greenford Quay, West London

The Lock, Greenford Quay, West London

Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Composite Decking Garden Transformation, Essex

Composite Decking Garden Transformation, Essex

More inspiration from Glass fibre-reinforced plastics (GRP) moulded open mesh gratings

View inspiration
Chirag Oil Field

Chirag Oil Field

GDF Suez Cygnus Bravo

GDF Suez Cygnus Bravo

Solan Topside

Solan Topside

Clair Ridge Oil Field

Clair Ridge Oil Field