OVERVIEW
Slate Hyperion Frontier Composite Decking was selected for Malmasion Hotel's renovations.
The client had old and weathered hardwood decking in the hotel terrace areas and all of the room balconies, on a seafront hotel which required replacing as part of a complete hotel refurbishment.
To replace the current decking the client required a commercial grade, anti-slip board that could withstand the harsh salt water environment for over 25 years.
The Solution
Frontier range in the Slate colour was specified for the project as the highly durable outer board layer provided the perfect protection against the elements and the high customer usage. With the additional warranty against stains and fading the client was assured at the lasting quality and aesthetics of the board with little maintenance ever being required.
EnviroBuild’s expert team also provided full project support including bespoke short notice delivery direct to site, which helped the client complete the job on schedule.
Customer Feedback
After the successful installation and service received from the EnvrioBuild team, the client has specified Hyperion decking on a number of other Malmaison hotels across the UK.
Project Details
Size: 450 m²
Product:
Substructure: Treated timber
Build time: 4 weeks
Location: Brighton
Hyperion® Frontier Composite Decking
Non-Combustible Luxury Italian Porcelain- Bomore Road
Belvoir Vue Luxury Home Cladding
Non-combustible aluminium decking- Acton Gardens
Residential Apartment Decking- Ebury Place
Clockwork Building Rooftop Balcony Decking
The Lock, Greenford Quay, West London
Composite Decking Garden Transformation, Essex
Chelsea Flower Show, London