OVERVIEW
The FasTop RS69 polyurethane cement system was used for this ongoing Bangladesh food production plant project to deliver a heavy duty hygienic floor. Sherwin-Williams FasTop Multi RS69 product used in this system delivered a thickness of 6 mm overall and 9 mm in selected areas under machines where the floor would be subjected to boiling water. The initial area totalled 3500 sqm, and then further areas were done as the applicator worked through the factory. The project was the first time Quality Floors Bangladesh Ltd. team had taken advantage of the FasTop technology which featured extreme application conditions, including temperatures of 34-36oC, day and night, and also air humidity up to 100%.
Resin flooring system FasTop™ RS69
The Copperworks in Leeds required a floor refurbishment over some 30000 square metres - Sherwin-Williams Resucoat HB product provided the solution.
Decorative and seamless flooring supplied for atrium area to Radclyffe School
Morrisons hot cross bun bakery gets long lasting flooring solution
Bright UV stable floor coating installed at Duxford Air Museum to show off aviation exhibits at their very best
ROUNDHOUSE TRUST, CAMDEN, LONDON
WAGWORKS, FULHAM, LONDON
CEDARWOOD HOUSE, BATH
GREAT ORMOND STREET HOSPITAL – Zayed Centre for Research into Rare Disease in Children - London