OVERVIEW
The largest refurbishment since its opening in 1900 required a full system of ARDEX products. DMC Contracts Limited credited the success of the project not only to the enhanced performance of ARDEX products, but also to the on-site technical support they received at every stage.
ARDEX A 38 Ultra Rapid Drying Screed Cement
ARDEX AM 100 Rapid Set One Coat Tiling Render
ARDEX X 77 Flexible Wall and Floor Tile Adhesive
ARDEX A 46 Multi-Purpose External Repair Mortar
ARDEX-FLEX FL Flexible Rapid Set Tile Grout for Wide Joints
ARDEX X 78 MICROTEC Flexible Standard Set Semi-Pourable Floor Tile Adhesive
British Museum - London
Victoria and Albert Museum - London
North Manchester General Hospital
Royal Bank of Scotland
Koster Flooring Systems, 96 Middlesex St. London
Koster Floor coatings to a domestic garage.
Aintree Racecourse - Koster Flooring Systems to Grandstand
Koster Flooring Systems - Protection to Concrete bund
Madrid Airport
Tollcross International Swimming Centre
Savoy Hotel Restoration Project
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks
UltraTile works up an appetite at Slim Chickens
Houses of Parliament - London
Sydney Opera House - Australia
St.David's Shopping Centre - Cardiff
Thames Lido
St George's Chapel - Westminster Cathedral London
Contemporary New Build - Oxted
Somerset New Build
Madrid Airport
McDonald's Tiling Refit for UK Restaurants
London Aquatic Centre - Olympic Pool
King's Cross Railway Station