OVERVIEW
Building One at Ruskin Square is the first of five that are planned as part of a £500 million development adjacent to East Croydon station. The building was designed by Shedkm architects and constructed by Lendlease and comprises a 9 storey 184,000 sq ft office building which has been fully let to HMRC. The building has two cores and these have 2700mm high Novista Steel Riser doorsets on all four sides which have been painted with emulsion the match the adjoining wall making them virtually invisible when to door is closed.
Contractor: Lendlease
Architect: Shedkm Architects
Location: London
Products Supplied: Novista Steel Risers
Novista Concealed Steel Riser – FD120 - Doorset With Hidden Frame
Macclesfield Town Hall - Restoration
Sidney Stringer Academy - Education
2012 London Olympics Athletes Village - Accommodation
Chelsea Barracks - Residential
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
Glasgow Royal Infirmary University Tower for NHS