OVERVIEW
Belfast Harbour’s estate spans over 8,000,000 sq. m. The award-winning 'City Quays II' development was completed in 18 months with a construction value of €31 million.
Kingspan RMG Simploc was installed on the ground floor Management Suite, with RMG and RMG Simploc fitted on floors three through to seven. RMG performs to PSA medium grade, featuring galvanised steel-encapsulated panels that come with a 25-year total system warranty. The system has also been designed so that the flooring can be easily removed or replaced.
RMG600 - Medium grade steel particleboard