NBS Source
I'm a manufacturer

GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

OVERVIEW

GEC ANDERSON OFFERS PRISTINE PERFORMANCE FOR UCS SPORTS PAVILION


The fit out of a major new academic sports facility in North London has included the selection of custom built sinks, work-surfaces, shelving and other stainless steel units, manufactured and installed by sector specialist, GEC Anderson.


The University College School Sports Pavilion in Hampstead has been designed by Marcus Beale Architects (MBA) with LIFE Build Solutions of High Wycombe filling the role of main contractor. The area was farmland until the 20th century. The use as playing fields dates from the 1920s.


The 18th month project encompassed upgrades to the schools playing fields themselves and the erection of a two-storey structure with extensive changing room facilities, showers and toilets on the first floor. The comprehensive catering facilities include kitchens large enough to serve a dining area which can seat 200. Amongst the stainless steel fabrications designed and fashioned by GEC Andersons highly experienced workforce are a number of base units which combine with single section work-surfaces, sinks and splashbacks to create an easily cleaned, hygienic and ergonomic working environment.


As well as the actual kitchen, GEC Anderson also supplied adjustable wall shelving and an L-shaped, three level base unit for a food storage and preparation area. In several places GEC Andersons site survey and subsequent liaison with the project team, which also included The Litmus Partnership Ltd. Catering Consultants, led to units being tailored to fit around structural columns and to accommodate different sized pieces of catering equipment.


The stainless steel back bar, with associated fabrications and appliances were also supplied and installed by GEC Anderson.


A spokesperson for MBA commented: In 2015 MBA won an invited competition to design a new sports pavilion on the site. Thorough analysis of the topography and the wider views led to a radical design for a pavilion in two parts, linked by a bridge angled westwards to align precisely with the Wembley Arch.

Products featured in this case study

View all products (59)
V90 Stainless Steel Shelving System - Shelf Units

V90 Stainless Steel Shelving System - Shelf Units

Stainless Steel Worktops - Sanitary Worktop

Stainless Steel Worktops - Sanitary Worktop

Stainless Steel Splashbacks - Kitchen Splashback

Stainless Steel Splashbacks - Kitchen Splashback

Stainless Steel Legs - Worktop Leg Support

Stainless Steel Legs - Worktop Leg Support

More inspiration from Anderson, GEC Ltd

View inspiration
Foster + Partners

Foster + Partners

Bartlett School of Architecture

Bartlett School of Architecture

GEC Anderson Island Top

GEC Anderson Island Top

GEC Anderson Outdoor Kitchen

GEC Anderson Outdoor Kitchen

More inspiration from Worktops

View inspiration
A Calm Spa Retreat

A Calm Spa Retreat

Modern Simplicity

Modern Simplicity

Ice Blue Reflections

Ice Blue Reflections

The Stone Island

The Stone Island

More inspiration from Leg supports

View inspiration
Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

Olga Primary School

Olga Primary School

Barrow Hall Primary School

Barrow Hall Primary School

Manor Street Medical Centre

Manor Street Medical Centre

More inspiration from Shelf units

View inspiration
Apartment.Base 4.0

Apartment.Base 4.0

KEUCO accessories for international guests in the Hilton hotel at Munich airport

KEUCO accessories for international guests in the Hilton hotel at Munich airport

The Glass Building, Camden

The Glass Building, Camden

Creative Spaces

Creative Spaces

More inspiration from Kitchen splashbacks

View inspiration
Sony Computer Entertainment, London

Sony Computer Entertainment, London

Stainless Steel Provides Stunning Contrast To Georgian Surroundings

Stainless Steel Provides Stunning Contrast To Georgian Surroundings

Stainless Steel Proves A Popular Choice For Fitzjohn's Primary School

Stainless Steel Proves A Popular Choice For Fitzjohn's Primary School

GEC Anderson Contribution To New Art Facility At Stowe School

GEC Anderson Contribution To New Art Facility At Stowe School