OVERVIEW
Delta Registered Installers, Bensleys provided a waterproofing solution on an iconic Brighton structure.
Steeped in history and thought to be built on the original Brill Baths site, sits Clarendon Mansions. This large, detached structure is thought to have been built in 1870 by Charles Brill during the Brighton boom.
The four-storey building facing Brighton’s famous sea front, was originally constructed as a hotel.
Numerous refurbishments over subsequent periods of time, saw the structure move from a hotel to a public house, with the basement area being unoccupied for nearly a decade.
The basement area boasts large, vaulted areas to the south and west elevation, with the south-side possibly being part of the original Bath structure.
Bensleys were instructed by the main contractor, Pilbeam Construction on behalf of Evolution Architects, to help design, specify and install the waterproofing system.
There’s no one-size-fits-all when it comes to waterproofing design. With the basement suffering from water penetration, Bensleys worked with the design team at an early stage of the project to ensure the right approach be taken, which included multiple factors such as: customer requirements, standards, robustness, cost, resources, time, skill required, safety and expectations of ground water which all translated into a design solution.
Koster Repair Mortar Plus
Koster Polysil TG 500
Delta Dual V3 Packaged Pump Station
Delta MS20 - Cavity Drainage Membrane
Delta Dual V4 Packaged Pump Station
Delta Channel System
Delta Foul V3 - Package Pump Station
Delta 800 Series Bespoke Packaged Pump Station (Foul Water) - Packaged Pump Station
Basement Waterproofing
Flood Recovery – Grade II Listed Building
BRE Flood Reilient Test Home
The Gunnery, Kent
Koster Flooring Systems, 96 Middlesex St. London
Koster Floor coatings to a domestic garage.
Aintree Racecourse - Koster Flooring Systems to Grandstand
Koster Flooring Systems - Protection to Concrete bund
Waterproofing the London School of Economics
Structural Waterproofing Mixed Commercial Development
Remedial Basement Waterproofing
Future Proofing Waterproofing Multi Level Commercial New Build Structure
Waterproofing a 116-Bed Care Home, London
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
375 Kensington High Street
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
Remedial Basement Waterproofing
Structural Waterproofing Mixed Commercial Development
Remedial Basement Waterproofing