OVERVIEW
Duo D411Glass Infill Top Fix
Orbis OS210 Glass Infill Side Fix
The project aim was to deliver a world class facility and training space the new National College for High Speed Rail in Doncaster.
3D photo realistic visualisations gave the contractor and architect the ability to see the impact of the twin flat balusters from the precision engineered Duo system pre-construction.
With a stunning combination of powder-coated metallic uprights, complemented with stainless steel fittings to produce a dynamic and contemporary appearance, the Duo system complimented this modern building.
The use of BIM along with the collaboration of Willmott Dixon, Bond Bryan Architects and numerous subcontractors allowed the project to run smoothly and to be handed over virtually defect free.
Balustrade System with Double Flat Post and Glass Panel Infill - Duo D410/D411
Orbis OS211 and OS200 Balustrades Create Impactful Stair at Pencoedtre High School
Orbis OS210 Glass Balustrades Installed at Castle Park View, Bristol
Orbis OS211 Create Luxury Aesthetics at Brio Retirement Living
Vista V511F Balustrades Provide Uninterrupted Views of Spen Valley Leisure Centre Swimming Pool
Broadleaves Extra Care, Newark
Hilton Garden Inn, Terminal 2, Heathrow Airport
Balcony Seal Installation
POSIglaze side-fixed black Juliet Balcony