OVERVIEW
The Wave is a new inland-surfing lake, powered by 100% renewable electricity that provides the opportunity to surf all year round regardless of weather conditions or tides. The site’s entrance and car park suffered from boggy ground conditions following spells of wet weather and with approximately 2,750m2 of impermeable surfacing, there was limited potential for infiltration. The shuttle bus route between the main facilities and the car park is now surfaced with Truckcell 80 Permeable Paving blocks, filled with free draining angular gravel to allow rainwater to percolate down to the existing sub-soil.
ABG Truckcell 80 - Gravel
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK
Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool
Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK
SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK
Reinforced Gravel Car Parking Installation at Belper School using X-Grid Gravel Grid
SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK
All Golpla-Recycled Reinforced Grass & Gravel Grass Paver Case Studies - Brochures - Data Sheets - General Info & Technical Advice
Easy off road parking using SureCell as a base for sureset resin bound permeable paving