NBS Source
I'm a manufacturer

The Lyric, Hammersmith

OVERVIEW

GEC Anderson stainless steel back bar counters and units were specified for the Foyer Bar and Mezzanine Kitchen at landmark London theatre, the Lyric.


Mica architects were asked to handle the extensive refurbishment and GEC Anderson were awarded the contract to supply and install their specialist back bar equipment. Although the overall area of the bar is quite large, including all of the required items and equipment within its confines was quite challenging. Careful planning and design was necessary to achieve it and some unique fabrications and inventive use of available space were needed. Careful co-ordination and liaison between the GEC Anderson, the theatre and the design team enabled the end result to be realised.

Products featured in this case study

View all products (59)
Decimetric® Base Cabinets - Stainless Steel Kitchen Units

Decimetric® Base Cabinets - Stainless Steel Kitchen Units

Stainless Steel Worktops - Sanitary Worktop

Stainless Steel Worktops - Sanitary Worktop

More inspiration from Anderson, GEC Ltd

View inspiration
Foster + Partners

Foster + Partners

Bartlett School of Architecture

Bartlett School of Architecture

GEC Anderson Island Top

GEC Anderson Island Top

GEC Anderson Outdoor Kitchen

GEC Anderson Outdoor Kitchen

More inspiration from Worktops

View inspiration
A Calm Spa Retreat

A Calm Spa Retreat

Modern Simplicity

Modern Simplicity

Ice Blue Reflections

Ice Blue Reflections

The Stone Island

The Stone Island

More inspiration from Kitchen drawer units

View inspiration
GEC Anderson Products Feature At The Hold, Suffolk

GEC Anderson Products Feature At The Hold, Suffolk

Wembley Park Underground Station

Wembley Park Underground Station

Okeford Crafts

Okeford Crafts

Theatre Upgrade 1

Theatre Upgrade 1