OVERVIEW
BMW Hollenstein in Aesch near Basel fully utilizes innovative technology. Completed in 2012, the operations centre uses only pioneering, sustainable infrastructure. The fully electric powered BMW models i3 and i8 are recharged at a special station prominently situated by the entrance. The electricity comes from a powerful solar energy plant located on the top of the roof. Any surplus electricity is fed back into the grid.
Little wonder, then, that only doors of usual design and construction were suitable for a building such as this. Again, innovation has found its way here too, enabling us to build one of Switzerland’s first record THERMCORD systems into the entrance porch.
Record THERMCORD Thermally Separated Automatic Door
New Horizons for record uk
Royal Blackburn Hospital
CBRE, St Martin's Square
UCLan Student Centre - University of Central Lancashire
First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.
Rundum Original garage doors provide unique feature in prestigious Cornish development
Stylefold Hinged sliding folding acoustic moveable wall - Crown Commercial Services (CCS) offices, Norwich
Stylefold Hinged sliding folding Glass moveable wall - Brighton Day Nursery School