OVERVIEW
A recent upgrade to the prestigious Empress State Building for the Metropolitan Police was conducted by main contractor, Overbury.
As part of the works, stainless steel shelving by GEC Anderson was specified to the vistor’s property store room. The room was very irregularly shaped and so the shelving (5 tiers of 500mm wide shelves) was specially made to suit. A total of 75 metres of shelving was supplied and installed by GEC Anderson for specialist sub contractor, BA Joinery.
V90 Stainless Steel Shelving System - Shelf Units
Foster + Partners
Bartlett School of Architecture
GEC Anderson Island Top
GEC Anderson Outdoor Kitchen
Apartment.Base 4.0
KEUCO accessories for international guests in the Hilton hotel at Munich airport
GEC Anderson Offers Pristine Performance For UCS Sports Pavilion
The Glass Building, Camden