OVERVIEW
One of the world’s largest battery storage facilities is taking shape on the site of the former power station at Roosecote, near Barrow in Cumbria. Commissioned by Centrica, as part of a £180m investment programme to develop new, flexible power plants across the country, the Roosecote battery storage facility is a state of the art project that will store energy harvested from the grid until needed.
With work on the site expected to be completed by the end of 2018, when the facility comes online it will boast the capacity to generate a staggering 49MW. That’s enough electricity to power around 50,000 homes at a very nimble response time of less than a second. Containing approximately 100,000 battery cells, it marks a new era for the energy industry.
Steel Door - Panic PAS 24
Steel Door - Personnel PAS 24
Steel Door - Personnel SR2 LPS 1175 (B3)
Steel Door - Panic SR2
Steeldor: Asda Supermarket
Steeldor: Enterprise Court, Blackpool
Steeldor: Wirral Metropolitan College
Steeldor: AFC Fylde Mill Farm
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
Glasgow Royal Infirmary University Tower for NHS