NBS Source
I'm a manufacturer

Steeldor: Cambridge Cycle Point

OVERVIEW

There may well be 9 million cycles in Beijing, but now in Cambridge at least 3,000 cycle commuters are starting to benefit from the opening of a state-of-the-art cycle park.


Cycle-Point is located close to the main railway station to encourage the cycle-mad city’s pedallers to let the train take the strain. Confident that they have left their wheels in a safe and secure environment.


Products featured in this case study

View all products (24)
Steel Door - Thermal Personnel

Steel Door - Thermal Personnel

Steel Door - Fire Rated Panic Thermal

Steel Door - Fire Rated Panic Thermal

Steel Door - Thermal Panic Exit

Steel Door - Thermal Panic Exit

Steel Door - Personnel

Steel Door - Personnel

Steel Door - Panic - Bespoke Steel Doors

Steel Door - Panic - Bespoke Steel Doors

Steel Door - Personnel with Louvre

Steel Door - Personnel with Louvre

Steel Door - Panic Exit with Louvre

Steel Door - Panic Exit with Louvre

Steel Door - Panic with Vision

Steel Door - Panic with Vision

More inspiration from Strongdor Limited

View inspiration
Steeldor: Asda Supermarket

Steeldor: Asda Supermarket

Steeldor: Enterprise Court, Blackpool

Steeldor: Enterprise Court, Blackpool

Steeldor: Wirral Metropolitan College

Steeldor: Wirral Metropolitan College

Steeldor: AFC Fylde Mill Farm

Steeldor: AFC Fylde Mill Farm

More inspiration from Carbon steel doorsets

View inspiration
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

Glasgow Royal Infirmary University Tower for NHS

Glasgow Royal Infirmary University Tower for NHS