OVERVIEW
Capital Dock, a 22-storey mixed use
development, including office blocks
and residential areas, is in the vibrant
Dublin Docklands and was developed by
Kennedy Wilson.
John Sisk & Son were the main
contractors, and Clarke Contracts
installed 25,000m² of Cemfloor, the
chosen screed for the project.
The main advantage Cemfloor has over the flowing screeds is the quicker drying time. It also eliminates any risk of incompatibility with cement-based adhesives and levellers and no special preparations are needed before hand. After looking at their options, Cemfloor was chosen for the project due to its faster installation time and drying time compared to traditional sand and cement screeds. This helped to keep the project on track with its tight building schedule.
Due to its flowing nature, Cemfloor was pumped and placed 20 stories high without issue. The limited space available on site was also a factor to be considered and was resolved by using Cemfloor. It was delivered to the site ready mixed which eliminated the need of on-site mixing and storage of sand and cement on site.
Cemfloor CT C25F5 - Liquid Screed
Cemfloor CT C30F6 - Liquid Screed
Cemfloor CT C20F4 - Liquid Screed
Devenish College, Enniskillen
Randox Laboratories
Ballymore Royal Wharf
Oval Village, Kennington, North London
EcoWorld Brentford
Lululemon - Vancouver, Canada
Saxton Lane
Niles Bakery, St Austell