OVERVIEW
With the goal to create one of the most prestigious residential addresses in the North East, the £38 million Echo 24 project demanded a powder coating solution with unrivalled durability and a finish that was second to none. Following its impressive track record on other high-profile jobs, the metalwork fabricator on the project handpicked the Sherwin-Williams approved-applicator, Architectural Powder Coatings, to deliver the perfect finish.
In total, a ton of metallic silver Syntha Pulvin powder coatings from Sherwin-Williams was applied to all external metalwork on the residential building, including windows and the curtainwall – covering almost 10,000 square meters of metal.
As well as giving this Sunderland landmark a stunning look, the Sherwin-Williams highly-durable polymer coating came with a 30-year guarantee – five more years than its previous warranty. This made it one of the most reliable coatings available in the industry.
Syntha Pulvin - Polyester Powder Coating
SYNTHA PULVIN CASE STUDY ECHO 24 – SUNDERLAND, ENGLAND, UK
SYNTHA PULVIN CASE STUDY GREAT WEST HOUSE – BRENTFORD, UK
SYNTHA PULVIN CASE STUDY SPINNAKER TOWER – PORTSMOUTH, UK
Citadel Bridge Hamburg, Germany
Wood finish solar shading on aluminium
Evolution gold façade, Covent garden
Blackhorse Mills, Walthamstow. Terracotta feature facade
Rusty Barn roof