OVERVIEW
Fast-Track Solution
Client: Randox Laboratories
Main Contractor: Corramore Construction
Screed Installed By: O'Neill Concrete Flooring Ltd
Screed Supplied By: Robinson Concrete
Cemfloor C30F6 was chosen for this project due to the fast-tracked construction of a new laboratory to provide urgently needed Covid-19 test kits.
As part of their on-going commitment to produce much needed Covid-19 test kits; Randox Laboratories Ltd invested in a new facility at its existing headquarters in Crumlin, Co Antrim.
The specialised laboratory, the development of which was fast-tracked over the space of four weeks, is the first step in a wider diagnostics investment programme from the company.
Given the tight construction programme; Cemfloor were contacted and asked to propose a solution for the project.
Cemfloor CT C30F6 was specified and over a period of just 2 - days; 3800m2 was installed by O'Neill Concrete Flooring Ltd with the screed being supplied by Robinson Concrete Ltd.
Due to the high early strength of Cemfloor C30; the screed was loaded with access lifts 3 - days after installation which ensured that the build programme was able to continue with minimal disruption.
A liquid surface DPM was used to allow the vinyl flooring be installed onto the screed only 7 - days after installation.
Due to the incredible amount of effort by all parties involved; the entire project finished ahead of schedule with no issues.
Cemfloor CT C25F5 - Liquid Screed
Cemfloor CT C30F6 - Liquid Screed
Cemfloor CT C20F4 - Liquid Screed
Mobicem Liquid Screed CT C25F5
Devenish College, Enniskillen
Ballymore Royal Wharf
Oval Village, Kennington, North London
Capital Docks, Dublin
EcoWorld Brentford
Lululemon - Vancouver, Canada
Saxton Lane
Niles Bakery, St Austell