NBS Source
I'm a manufacturer

2 Storey Beach Front House, Seadune.

OVERVIEW

The land owners of Seadune contacted us as they were having planning using regarding the foundation design on their new house that they were looking to build. The site in question was very close to the coast and they were effectively building on the beach. As such the planners required the building to have foundations that would allow the building to be dismantled and moved away from the sea in the event of major coastal erosion.

As FastSlab is constructed using galvanised steel screw piles it is perfect to be used in coastal areas. Each section is also bolted together and as such can be unbolted. This allowed us to build into the design a way of unhooking all the elements and to be able to re-position them further away from the initial location should the need arise.


Seadunes ground floor area of this project is 120m2 and the whole system was installed in just 5 days.

No featured products in this case study

Contact CDI Innovative Construction Materials Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from CDI Innovative Construction Materials Ltd

View inspiration
New Lewis Deck Installation Videos

New Lewis Deck Installation Videos

New house, Perth, Scotland

New house, Perth, Scotland

Op-Deck to the Curly House

Op-Deck to the Curly House

Various Max4 Images

Various Max4 Images