OVERVIEW
The 51 storey tower in the heart of London’s financial district will offer 52,900m² of office, retail and event space. Sustainability has been a key design driver, aiming for a BREEAM Outstanding Rating. Only the most energy efficient technology will be considered to deliver on the BREEAM Outstanding Rating objective.
In line with the building’s sustainability design strategy, Belimo EPIVs were specified to be fitted on the Fan Coil Units. A space-saving flushing bypass assembly that incorporated the EPIV and fitted well over the drip tray of the Fan Coil Unit was required. The successful supplier had to work closely with the fan coil unit manufacturers to design the most compact, space saving configuration for the Fan Coil Unit of choice.
FloControl offers a prefabrication service, liasing with any Fan Coil manufacturer to work out the best-fitting configuration for the model selected, incorporating any control valve including the EPIV into a DZR ByPass configuration assembled with FlowCon component parts. FloControl was appointed to prefabricate 2500 FloSets Contract for the entire building. FloControl was able to not only incorporate the specified control valve, but also offer bespoke copper pipe connections, saving space, as well as a reliable management process, for testing, pallet and product labelling as well as the call-offs.
Contact FLOCONTROL LTD by clicking the button below to find out which products were used in this case study.
The London Fruit & Wool Exchange
Fidelity Offices Cannon Street London
Schroders London Wall Place London
Bloomberg Cannon Street London