NBS Source
I'm a manufacturer

AATi Anti-slip Stair Nosings for London Bridge Station

OVERVIEW

AATi supplied a staggering 2500 metres (1.55 miles) of cast metal anti-slip stair nosings for the major re-development at London Bridge Station! AATi worked closely with Laing O’Rourke to develop a phased delivery schedule in order to hit key milestones during the projects construction from January 2016 right through to December 2017. Due to the unique ability to manufacture bespoke cast metal products, AATi were on hand to resolve an issue on the project by designing a bespoke nosing to fit around the handrail posts throughout the station.

No featured products in this case study

Contact AATi (Antislip Antiwear Treads International) by clicking the button below to find out which products were used in this case study.

More inspiration from AATi (Antislip Antiwear Treads International)

View inspiration
THFC - Tottenham Hotspur Football Club

THFC - Tottenham Hotspur Football Club

AATi - The most durable nosings!

AATi - The most durable nosings!

Kings Cross Triplets - Contractor: Maylim Limited   Kings Cross Triplets cast Gunmetal bespoke floor plates  The Kings Cross Triplets also known as Gas Holders 10, 11 & 12

Kings Cross Triplets - Contractor: Maylim Limited Kings Cross Triplets cast Gunmetal bespoke floor plates The Kings Cross Triplets also known as Gas Holders 10, 11 & 12

Coal Drops Yard - Kings Cross London

Coal Drops Yard - Kings Cross London