Access flooring once again was selected for this major £12 million building in Cheltenham. Bathgate Flooring manufactured and installed over 5600m2 of Panels to ensure that this Grade A office space offered the maximum flexibility.
Products Used
BGM 600 Steel Encapsulated Panels
Constructing this Office Development is well recorded with a time lapse video of the entire project available through the Gloucestershire Live news story.
Access Flooring is used in buildings like this to ensure that there is easy access to the services if needed. Simply lift up the floor panels and all the cabling is visible beneath.
No featured products in this case study
Contact Bathgate Flooring Ltd by clicking the button below to find out which
products were used in this case study.