In partnership with Tidyco, Powrmatic was selected to supply an energy-efficient air rotation heating system for a 5,100m2 warehouse storage facility in Derbyshire using a Powrmatic TEx41 Air Rotation Heater measuring over 20ft tall.
Project Background
Tidyco was approached by a customer who is involved with manufacturing, transport and additional services in the aerospace industry amongst others. After recent success, their customer needed to expand their footprint and managed this by moving into a newly built warehouse situated in Derbyshire.
Solution
As this was a brand-new commercial building, there was no heating provision and just the original lighting installed by the builder, which was not fit for purpose. Tidyco was tasked with installing an efficient and effective means of heating solution for the 5,100m2 (55,000 sq ft) vast space along with a modern lighting system. In order to heat and illuminate this space, which occupied a space of more than seven and a half football pitches, some heavy-duty kit was required.
Result
For the heating aspect, Tidyco engineers installed an internal Powrmatic TEx 41 air rotation heater, manufactured in the UK. With an output of 350 kW, the unit measured in at over six metres (20 ft) tall. This particular TEx model was gas-powered and has the superior capacity to provide complete climate control for a 55,000 sq ft with a single TEx Air Rotation Heater.
Contact Powrmatic Ltd by clicking the button below to find out which products were used in this case study.
ILG Distribution Centre Heating
Community Centre Heating - Harrow Club
Sports Hall Radiant Heating - Hoe Bridge School
Sports Direct Distribution Warehouse