NBS Source
I'm a manufacturer

AirMaster Case Story Grammar School

OVERVIEW

The mechanical consultants, Hamson Barron

Smith (HBS) of Haywards Heath, specified AirMaster

mechanical ventilation units with heat recovery. To meet

the demanding requirements of BB101, two units were

installed in each of the four laboratories and one in each

of the two computer labs and single training room.

Installing AirMaster units ensures that while the

laboratory airborne chemicals are efficiently extracted,

much of the harmful air pollution from outside is also

filtered out before it enters the room. The effective

filtration integrated into the AirMasters provides a

safeguarded environment for the students, free

of pollutants.

No featured products in this case study

Contact SAV Systems by clicking the button below to find out which products were used in this case study.

More inspiration from SAV Systems

View inspiration
RavenResidential Ironworks, Mill Road Case Study

RavenResidential Ironworks, Mill Road Case Study

RavenBuildings Manchester Regency Office Building Case Study

RavenBuildings Manchester Regency Office Building Case Study

Pressure Independent Thermostatic Radiator Valves Case Study

Pressure Independent Thermostatic Radiator Valves Case Study

AirMaster Manor Grange Case Story

AirMaster Manor Grange Case Story