The Asticus Building is a cutting-edge circular office space in the heart of South West London. The light-filled reception area features 250m2 of our Light Natural polished concrete, meticulously installed to complement a statement feature wall.
We worked with Iconic Build and Aukett Swanke to create an innovative curved shuttering system. This allowed us to pour the concrete at a consistent distance from the wall, navigating an intricate curved design that featured metal fins and uplighters — all set within the floor.
The concrete also flows into three lift reveals while four electrical floor box lids are infilled — cast at just 20mm thick — for a seamless finish.
With sustainability in mind, we installed a 100mm void former to reduce the overall depth of the floor by 50%. This allowed us to halve the amount of concrete and cement required leading to significant carbon reductions.
Installation was completed in just one week and handed back to the contractor. We returned at the end of the project for our signature seal and polish, ensuring that the floor achieved +36PTV in the wet — a gold standard anti-slip rating.