OVERVIEW
Balcony Refurbishment, Eindlyk, Hythe, Hants. Wecryl Waterproofing System
WestWood Liquid Technologies Wecryl Waterproofing & Balustrade System was successfully used on a balcony in Hythe, Hants. WestWood Approved Installers, Protec Roofing Ltd, cleaned and prepped the existing substrate. Firstly, Wecryl 176 Primer Layer was applied following the Waterproofing Layer Wecryl 230. After the Waterproof Layer cured a two component Protective Layer known as Wecryl 333 was installed. The system was completed by using a Tile Effect Finish with our Wecryl 488 Sealer Coat in RAL 7035 including black/white Deco Chips to provide some slip resistance.
Contact WestWood Liquid Technologies Limited by clicking the button below to find out which products were used in this case study.
The Old Bailey - Transformation of terrace areas across three floors of an occupied building
Winslade House - Complete roof terrace refurbishment with tile-effect finish
The Old Pump Works - Flexible and robust waterproofing for curved green roofs
Millstream West -- Complex roof refurbishment in the energy sector