OVERVIEW
Balcony Refurbishment, Eindlyk, Hythe, Hants. Wecryl Waterproofing System
WestWood Liquid Technologies Wecryl Waterproofing & Balustrade System was successfully used on a balcony in Hythe, Hants. WestWood Approved Installers, Protec Roofing Ltd, cleaned and prepped the existing substrate. Firstly, Wecryl 276 Primer Layer was applied following the Waterproofing Layer Wecryl 230. After the Waterproof Layer cured a two component Protective Layer known as Wecryl 233 was installed. The system was completed by using a Tile Effect Finish with our Wecryl 288 Sealer Coat in RAL7035 including black/white Deco Chips to provide some slip resistance.
Contact WestWood Liquid Technologies Limited by clicking the button below to find out which products were used in this case study.
The Plaza - A five-level multi-storey car park refurbishment
The Wedding Cake - Waterproofing installation on a structural piece of art
San Remo Towers - Intricate roof terrace refurbishment
The Old Bailey - Transformation of terrace areas across three floors of an occupied building