NBS Source
I'm a manufacturer

BioClad Specified at Wimbledon

OVERVIEW

Our antimicrobial wall cladding was specified for the multi-million-pound project to develop four commercial kitchens at SW19 to serve the thousands of guests, players, and VIPs who attend The Championships each year. Working alongside a number of contractors, we were heavily involved in the refurbishment of the kitchen and food preparation areas, where over 1000m2 of cladding was installed in Spring of this year.

No featured products in this case study

Contact BioClad by clicking the button below to find out which products were used in this case study.

More inspiration from BioClad

View inspiration
A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

Raigmore Hospital Critical Services Upgrade (CSU)

Raigmore Hospital Critical Services Upgrade (CSU)

BioClad/BioPod Specified for State-Of-The-Art Veterinary Clinic

BioClad/BioPod Specified for State-Of-The-Art Veterinary Clinic

Hinkley Point C Nuclear Power Station

Hinkley Point C Nuclear Power Station