OVERVIEW
The largest library in the whole of the UK was designed with the community in mind. The fashionable design was quickly accepted and turned into fruition. The building won the RIBA West Midlands Award and named the best overall building of the year in 2014 as well as being named “Building of the Year 2013” in The Architects Journal. Over 30,000, Grainger’s H Range, raised access flooring pedestals were installed here, by Carillion and Capita Symonds to provide a highly durable and decorative floor, under which cabling could be routed. Tucking all important services safely out of harms reach.