OVERVIEW
The Bournemouth Gateway Building showcases modern architectural elegance, with anodising playing a pivotal role.
Selecting a finish that complements the building's design while ensuring resilience against environmental factors was crucial.
Anodising emerged as the optimal solution, offering corrosion resistance and customisable color options.
Anodised aluminium provided enhanced aesthetics, durability against elements, color stability, and sustainability.
The integration of anodising into the Bournemouth Gateway Building exemplifies a fusion of aesthetic appeal, durability, and sustainability in contemporary architecture.
Main Contractor - Kier Construction
Location - Bournemouth
Rainscreen Cladding - Sotech Optima Interlocking Plank
Finishes:
100A Natural Silver
Regency Gold 1
Anolok 541
Contact United Anodisers Ltd by clicking the button below to find out which products were used in this case study.
Olympic Cauldron, Abu Dhabi, 2019
Leeds Railway Station
Imperial College London
Titanic Signature Building Belfast