NBS Source
I'm a manufacturer

Cartcraigs, Glasgow

OVERVIEW

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.


The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.


Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.


In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.


A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.



Our Service


Due to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.


Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.


As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.


They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.


“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”


Kevin Fox, PWM Projects Manager



Technical Project Details


The original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.


After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.


Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.


The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.


Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.


“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”


David Locke, Mast Architects

Products featured in this case study

View all products (7)
K Systems M, Mineral Wool External Wall Insulation (EWI) system

K Systems M, Mineral Wool External Wall Insulation (EWI) system

More inspiration from K Systems Insulated Facades

View inspiration
Limehouse Basin,

Limehouse Basin,

Bishop Auckland, Durham

Bishop Auckland, Durham

River Gardens, London

River Gardens, London

N V Buildings, Salford

N V Buildings, Salford

More inspiration from External wall insulation systems

View inspiration
Limehouse Basin,

Limehouse Basin,

Bishop Auckland, Durham

Bishop Auckland, Durham

River Gardens, London

River Gardens, London

N V Buildings, Salford

N V Buildings, Salford