OVERVIEW
The Lift 109 viewpoint designed by Ralph Appelbaum Associates has opened within the rebuilt chimney of Battersea Power Station in London. We manufactured and installed a concrete reception desk for the Lift 109 Experience reception area which is located in the Power Station’s magnificent Art Deco Turbine Hall A.
Living Concrete team used an innovative concrete application technique to create custom-built reception desk for our client Beck Interiors. MicroConcrete fluted tiles in Willow Green colour were cladded onto MDF frame, seamlessly achieving a very complex and detailed design. Hand cast and hand polished oval shape concrete worktops in Ivory were assembled onsite. By using the best of modern technology, we have created a modern and robust design that demonstrates how concrete can be both good looking and functional.
Contact LIVING CONCRETE LTD by clicking the button below to find out which products were used in this case study.
Regeneration Project – King St Link, South Shields
Gap Cladding Panels Installation
Entrance Concrete Cladding
Concrete Lamp Shades