OVERVIEW
5 Everyman cinemas have been built in a new building in the centre of Harrogate which houses several other retail and leisure facilities.
The cinema directly above the ground floor retail units required a concrete floating floor whilst the 4 other cinemas required heavy dry floating floors with large floor voids.
Our local branch supplied and installed the floating floors which consisted of Stravifloor Channel isolation rails supporting timber/cement board sandwich constructions or Stravifloor Deck solution supporting a concrete slab.
The wall isolation and ceiling hangers completed the box-in-box construction delivering the required sound insulation between cinemas and to the retail units beneath.