OVERVIEW
This major redevelopment of Charlton Park Academy school involved replacing temporary mobile classrooms and a single storey building with a two-storey steel framed brick building to better meet the needs of students, teachers and carers. A structural flooring solution was required for use over precast planks, covering 800m2 on the ground and upper floor at a depth of 75mm to 120mm. Space and access would be challenging, due to the small footprint of the site, proximity to the existing school building and access from a busy main road. Given the large floor area, a traditional sand cement screed would have been very time consuming to place.
Tarmac’s TOPFLOW SF a self compacting steel fibre reinforced concrete was chosen as the solution. Its flowing nature would allow it to be quickly pumped into place and adapt to the variable thickness criteria. TOPFLOW SF is designed to act as a structural topping with both, steel mesh & fibre reinforcement. The steel fibres added to the TOPFLOW SF gave its robustness and flexural strength as it was being placed over a precast plank system that could flex with loadings. They also reduced the risk of cracking. By replacing steel mesh reinforcement, it helped avoid problems with access, storage and handling and kept the site open for parallel trades. Using TOPFLOW SF rather than a sand cement screed or reinforced concrete, improved productivity and saved time. This saved 13 days or just over 2.5 weeks on the programme.
Topforce
Topflow self compacting concrete
Tarmac Ultifastpave car park surface
Tarmac Ulticolour - coloured asphalt for tourist venue
Ulticolour asphalt Modern Housing Develeopment, Salford
Ulticolour coloured asphalt, busy tourist develeopment
Coloured concrete for skate park redevelopment
Fibre reinforced concrete for container terminal
Heavy duty fibre reinforced concrete for agricultural hardstanding
Fibre reinforced concrete for supermarket distribution centre - Cardiff