OVERVIEW
Penny Hydraulics has partnered with design and operations consultancy Bryden Wood on an ambitious and ground-breaking construction project for pharmaceutical giant GlaxoSmithKline which has resulted in estimated construction cost savings of 30% and a build time reduction of two months when compared to traditional building methods.