NBS Source
I'm a manufacturer

Heathrow Tunnel

OVERVIEW

Premcrete assisted BAM Nuttall on the Heathrow Tunnel project to undertake refurbishment work on the main and cargo access tunnels to the airport.


The Challenge:


Heathrow Airport has awarded BAM Nuttall a contract valued at more than £85m to undertake refurbishment work on the main and cargo access tunnels to the airport.

Part of the refurbishment works was to carry out concrete repairs to the spalled concrete using an R4 Structural Mortar in accordance with BS EN1504.


The Solution:


Premcrete supplied BAM Nuttall with Teknocem S which met the performance specification.

No featured products in this case study

Contact Premcrete by clicking the button below to find out which products were used in this case study.

More inspiration from Premcrete

View inspiration
Turnmills, Clerkenwell, EC1

Turnmills, Clerkenwell, EC1

48 Leicester Square

48 Leicester Square

1 Mayfair

1 Mayfair

Nine Elms - London

Nine Elms - London