OVERVIEW
Jubilee Bridge was constructed in 1977 - chloride contamination was causing corrosion of the suspended and cantilever reinforced concrete support beams, half-joint elements and the soffits of the beams
ICCP was used to protect cantilever beams, half-joints and suspended slab elements. Over 8,500 anodes were drilled in and are controlled in 20 zones with separate control of the beams and the half-joints.