OVERVIEW
Developed on what was previously the Strathclyde Police Headquarters, Holland Park is a residential complex with 4 towers ranging from 6 to 22 storeys in height, around a courtyard formation.
Challenge
Specialist building envelope company MetalTech Roofing & Cladding were contracted to secure the façade on this new development, with the task of fixing nearly 9,500m2 of façade to the external face of the buildings.
Solution
MetalTech approached Fixfast and requested a technical façade calculation for the Fixfast façade support system, which we provided alongside technical advice.
The Fixfast façade support system is a system for any application - including SPIDI® Max brackets: one bracket design means the system can be used in vertical or horizontal installation configurations and is engineered for both fixed and sliding points. Essentially, one bracket design means all challenges solved - simplifying material selection and on-site installation management.
The unique ribbed bracket design offers superior strength, allowing systems to be engineered for heavier loads, or potentially fewer brackets per square metre for lightweight panels.
With MetalTech needing to fix the façade simply but fast, Fixfast were able to work with them to get deliveries to site when they needed them, with the assurance of a versatile façade support system that works in a range of applications - wall cladding, soffits, or ceilings.
"In addition to supplying an innovative support bracket for this contract, Fixfast also continued to provide their usual first-class service. Engineering and design services were available from the outset and technical support was gratefully accepted during the build to help overcome some difficult details. We were fortunate in being able to use the same SPIDI Max bracket for both façade and soffit support in both aluminium and stainless steel. This greatly helped to simplify our process from design through to install. And with the site being in a restricted, city centre location, timely and flexible deliveries were required - which Fixfast duly achieved."
MetalTech Roofing & Cladding Ltd
Spidi Max rainscreen cladding subframe system - Facade support helping hand brackets
Ocado Distribution Centre
Morrisons - Sheppey
Exeter College Cohen Quad
Curious Brewery
Mock Veterinary Practice, University of Nottingham
Halcyon Way School, Oldham
Bradfield College
Water Treatment Plant