NBS Source
I'm a manufacturer

Howick Place, London

OVERVIEW

Within London’s sought-after area of Victoria is situated the architecturally cutting edge commercial and residential development, Howick Place.


This 143,000sq ft. of Grade A office space and 23 luxury apartments is a flagship development by joint developers Doughty Hanson & Co and Terrace Hill Group PLC. The building is modern, stylish and full of light due to its impressive floor to ceiling windows delivering a perfect working space for the luxury brands it has already attracted. Responsible for the impressive design were Rolfe Judd Architects. Not only did they want to create an exterior that that was visually stunning but also an interior that show modern design at its best.


This inspirational working environment had to make an immediate impact with potential occupant’s right from the moment they step in to the expansive reception area to rinsing their hands in the washrooms. To help achieve this Rolfe Judd appointed Sylan to supply and install their modern and luxurious washroom products so the building represented the highest quality craftsmanship no matter where you are in the building.


When discussing the importance of a quality washroom fit out project architect Andrew Wall said: “Our clients are becoming increasingly concerned with the quality of their washroom facilities. More and more people are cycling to work in the city and so we needed washroom and changing areas that met our client’s high standards”.


Sylan's Real Wood Veneer toilet cubicles were specified for the washrooms. With 44mm Real Wood Veneer doors and totally invisible fixings, Sylan was the perfect choice for this project given that quality was such an important factor:

“We were very impressed with the Sylan system. We needed a totally bespoke system and Sylan gave us just that. We needed flexibility from our cubicle choice so we could achieve the level of detail required for this project”.


Being offset against contemporary Lime Stone Vanity Units, also supplied by Sylan, the cubicles gave the perfect contrast between the traditional and the modern.


To further enhance this cutting edge design Glass Duct Panels were also installed in the washrooms. Being fully aware that accuracy and precision was critical to the build, Sylan ensured due care and attention was paid when installing all products but particularly when dealing with this delicate and intricate design element.


Sylan Products Supplied:

Real Wood Veneer Toilet Cubicles

  • Flush fronted
  • Strong and Secure
  • Invisible fixing system
  • Ideal for where low impact interiors are needed
  • Available in 11 Real Wood Veneers


Real Wood Veneer Duct Panelling

  • Co-ordinating panelling to cubicles
  • Infinite repetition of colour
  • Available in 11 Real Wood Veneers


Quartz Vanity

  • Extremely hard wearing
  • Classic style that will last for years to come
  • Available in 9 colours
  • Supplied with or without cut outs

No featured products in this case study

Contact Sylan by clicking the button below to find out which products were used in this case study.

More inspiration from Sylan

View inspiration
100 Embankment, Manchester

100 Embankment, Manchester

100 Longwater Avenue, Reading

100 Longwater Avenue, Reading

217 Bath Road, Slough

217 Bath Road, Slough

400 Longwater, Green Park, Reading

400 Longwater, Green Park, Reading