The Hurlford Avenue new build project, situated on the former Garscadden Primary School site, truly harnesses innovation and design. This ‘Modern Methods of Construction’ project, completed in partnership with CCG, showcases technical prowess and constructional excellence.


Garscadden Primary School closed back in 2017 but the 1930s school building remained standing. Spotting the potential for something impressive on the site, Glasgow Housing Association proposed a modern replacement – a portfolio of properties.


The key requirement was to build modern, energy efficient homes which would provide much-needed affordable housing in the sought-after area of Dumbarton and make a significant difference to the local community.


After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems devised a comprehensive delivery plan using our unrivalled experience and expertise.


CCG fabricated the building off-site with timber kits and incorporated elements from our Aricco system, with the final finish being completed on-site. This approach was advantageous for a few reasons, including the speed of construction and a reduction in required labour.


Hurlford Avenue is a prime example of our experience with off-site modular builds and our project-specific approach to EWI solutions. We brought Glasgow Housing Association’s vision to life and delivered 28 houses and 42 flats for mid-market rent.



Our Service


The build of the Hurlford Avenue development wasn’t without its challenges. Precision planning was required to ensure minimal disruption to the residents in surrounding estates. All traffic ways remained free for passage and noise pollution was kept to a minimum.


During the build, our team encountered some detailing challenges. However, working directly with the contractor and main contractor, these challenges were quickly resolved by key colleagues within our Technical Team, and the build remained on schedule and of the highest quality.


From specification and design to planning, delivery and evaluating, our team transformed a derelict site to a contemporary multi-dwelling development that rejuvenated the Dumbarton area.


“I would like to thank everyone on the K Systems technical support team for their contribution in accomplishing the Aricco System project at Hurlford Avenue. The regular visits from senior technicians always go a long way to keeping any project in check and it makes the job of our management much easier by having honest, professional judgement to go back to our guys, with well earned praise on this occasion. Everyone was onboard from the outset in working around any potential difficulties and you will agree it shows in the final results.”


Garry Barton, Contractor.



Technical Project Details


As the client of this project, Scotland based construction company CCG, approached K Systems to provide a suitable façade solution that would complement their design. A build with timber kits and a drained ventilated cavity system was specified, along with a silkolitt thin coat render finish.


CCG are renowned for off-site manufacturing (OSM) and manufactured the kits from their production site in near-by Cambuslang. They sourced the correct material according to our exact specification. CCG’s ‘iQ’ System was chosen, which is designed with a fabric-first approach where greater tolerances are determined by fewer junctions and thermal bridges to deliver enhanced U-values and significantly improve airtightness. By incorporating OSM and the iQ system into this project, it is just a small insight into our unrivalled knowledge and expert approach that we take to fulfil the requirements of our clients.


For the supporting façade, the K Systems Aricco system was specified - a drained ventilated cavity system perfectly suited for use in low rise buildings, particularly new build projects and timber framed construction. The Aricco system is also the most compatible with offsite/modular construction techniques and boasts an A2-s1, d0 fire rating and therefore complies with the latest building regulations, ensuring the safety of all residents.


The finish was just as important as the façade system, with the cost-effective, industry-leading Silkolitt thin coat render specified. Silkolitt renders provide a contemporary finish to new-build applications, something this project very much required to modernise the area. Silkolitt is simple to apply, and its hydrophobic properties makes the render low maintenance. It also has excellent vapour permeability, allowing the Hurlford Avenue properties to breathe and avoid interstitial condensation. It is the most flexible system on the market, making cracking over its lifetime less likely and therefore delivering a pleasing aesthetic with outstanding longevity.


The combinations specified by the K Systems team resulted in the build of impressive dwellings boasting a U-value of 0.13W/m ² K – meaning homes were easier and cheaper to heat, a particularly attractive benefit given the current cost of living crisis.

Products featured in this case study

View all products (7)
K Systems Aricco System For Timber Frame Buildings

K Systems Aricco System For Timber Frame Buildings

More inspiration from K Systems Insulated Facades

View inspiration
Limehouse Basin,

Limehouse Basin,

Bishop Auckland, Durham

Bishop Auckland, Durham

River Gardens, London

River Gardens, London

N V Buildings, Salford

N V Buildings, Salford

More inspiration from External wall insulation systems

View inspiration
Limehouse Basin,

Limehouse Basin,

Bishop Auckland, Durham

Bishop Auckland, Durham

River Gardens, London

River Gardens, London

N V Buildings, Salford

N V Buildings, Salford