NBS Source
I'm a manufacturer

Logistic Warehouse Heating

OVERVIEW

Overview

Powrmatic was selected to supply a frost protection warehouse heating solution for a massive 81,000m² building at Plot 2 at the Midland Logistic Park installed by Phase Mechanical Projects. a combination of 7 TE61 heating units and TE61 Destratifcation units were installed.


Project Background

The 81,000m² industrial logistic warehouse required frost protection with design parameters of -5°c external and +5°c internal.


Solution

One of our largest installations to date, 4 x TEG61 air rotation heaters were installed by our trusted partners Phase Mechanical Projects. Each TEG61 heaters boasts an impressive 525kW of heat output and were installed alongside 3 x TE61 destratification units to assist with the air turnover due to the size of the building. The 4 TEG61 heater units selected were designed to move 39m3/s of air around the building per unit, and when combined with 3 TE61 destratification units also at 39m3/s this gave a total air volume of 270m3/s which achieved the required 0.8 air movements per hour from the end client.


Result

The newly styled Powrmatic Air rotation units in our new RAL 7015 colour were installed expertly by Phase Mechanical Projects. The racked logistic warehouse will now benefit from a frost protection system which will protect the internal sprinkler system from freezing in the colder months. Each T.E manufactured at Powrmatic is custom built to specific project requirements.

No featured products in this case study

Contact Powrmatic Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Powrmatic Ltd

View inspiration
ILG Distribution Centre Heating

ILG Distribution Centre Heating

Community Centre Heating - Harrow Club

Community Centre Heating - Harrow Club

Sports Hall Radiant Heating - Hoe Bridge School

Sports Hall Radiant Heating - Hoe Bridge School

Sports Direct Distribution Warehouse

Sports Direct Distribution Warehouse