OVERVIEW
The Purple and Green MSCPs have capacity for more than 4,000 vehicles across five levels. The project’s scope involved concrete repair, structural strengthening using carbon fibre laminates, the replacement of the conduits, movement joints, drainage channels and deck waterproofing.
Contact Sika Limited by clicking the button below to find out which products were used in this case study.
Twickenham Stadium Resin Flooring
THE CUNARD BUILDING
Christ Church URC, Chelmsford
London Power Tunnels - Concrete for Tunnelling