NBS Source
I'm a manufacturer

Milner Hall, Winchester

OVERVIEW

THE CHALLENGE


Milner Hall, a former chapel in Winchester, is one of the oldest structures in the city and a building of great architectural and religious importance. Built by the Reverend John Milner in 1792, the hall is now used for community events and meetings. In addition to the significant heritage of Milner Hall, an X-ray of the western elevation found a number of voids in the foundation due to hundreds of years of water damage. What’s more, part of an inadequate retaining wall had collapsed onto the same elevation, with the potential to cause further damage if left untreated. When Tarmac’s Limelite team was approached regarding the Milner Hall project, they instantly recommended Tempo PCE who they’d successfully worked with a number of times. 


THE SOLUTION


Tempo PCE commonly chooses Limelite 7 for its projects; a Tarmac grout with hydraulic lime content that’s specially designed for heritage buildings, especially ancient structures such as churches. This was the ideal product to suit the needs of Milner Hall where the grout would need to be injected at a low pressure from the outside, directly filling the internal voids.


Tom Phillips, Director of Tempo PCE, said: “We regularly use Limelite products and Limelite 7 was ideal for the work required at Milner Hall. The technical support they offer is incredibly valuable, as well as their reach and industry-reputation. “We strive to only work with manufacturers who can offer value and work with us as partners to ensure the best possible product is provided for a strong finish. We certainly get that with Tarmac’s Limelite team.”


Iain Spence, Technical Manager for Tarmac’s Limelite range, added: “Historic structures often present suppliers with a wide number of challenges when it comes to the specification of suitable materials, and their subsequent installation. “In the case of the work at Milner Hall, the requirement was for a fluid, low strength grout that would stabilise the void in the masonry of this Grade II listed building. The Limelite Heritage Grout system provided a breathable low-density solution for these works. “Given the often delicate nature of period and historical structural repair projects, working with dedicated and knowledgeable contractors is essential to achieving the correct end result. Tempo PCE completed the works at Milner Hall utilising their extensive application skills with the Limelite Grout, delivering a much-needed structural support to the building’s foundations which should add many more years to its operational life.” 



No featured products in this case study

Contact Tarmac by clicking the button below to find out which products were used in this case study.

More inspiration from Tarmac

View inspiration
Tarmac Ultifastpave car park surface

Tarmac Ultifastpave car park surface

Tarmac Ulticolour - coloured asphalt for tourist venue

Tarmac Ulticolour - coloured asphalt for tourist venue

Ulticolour asphalt Modern Housing Develeopment, Salford

Ulticolour asphalt Modern Housing Develeopment, Salford

Ulticolour coloured asphalt, busy tourist develeopment

Ulticolour coloured asphalt, busy tourist develeopment