OVERVIEW
SMARTPLY MAX FR B panels are being installed as part of a large and exciting regeneration project in the heart of Liverpool.
Contact MEDITE SMARTPLY by clicking the button below to find out which products were used in this case study.
MEDITE TRICOYA EXTREME Proves The Natural Choice At High - End Coastal Redevelopment.
SMARTPLY OSB used for giant tree at Glastonbury 2017
SMARTPLY FR/FR Build (Flame Retardant) OSB3 flooring pave the way for new Students in Liverpool
SMARTPLY PATTRESS PLUS- THE TIME SAVING PANEL GREATLY REDUCES INSTALL TIME